Tuesday 15 May 2012

easter weekend digging project

We've been busy over the easter bank holiday (6th-9th april) digging and making a huge soak away with a storage tank in it.
girl power!!!!

this was after we had to swap the big 3tonne dumper for this little 1tonne because it sprung an oil leak in the hydraulic hose down the field!!!!!


ethan playing with his radio control boat in the hole that is filling up with water even though the guttering isn't connected yet!!!!



tank and rubble going in guttering connected and it has NOT stopped RAINING!!!!


water running in uuu ohhhh!!!! and we're STILL on a HOSEPIPE BAN!!!


dad standing in the hole on top of the tank and its still RAINING!!!! ohhh dear!!!!